 |
Construction of fuselage form prior to planking for manufacture of fuselage mould. |
|
 |
Fuselage form tool ready for mould manufacture. |
|
 |
First stage of manufacture of fuselage mould upper half. |
|
 |
Moulds (upper and lower) removed from primary tool. |
|
 |
Preparation of tool form for manufacture of inlet duct fairing. |
|
 |
Mould tool for inner nose sub-section to carry avionics crate assembly. |
|
 |
Fuselage top shell moulding. Vacuum cured 100% carbon with all harch/door and access panels moulded with steps and buttstraps. |
|
 |
Internal detail construction showing all fuselage formers, each item an individual carbon moulding. |
|
 |
Airframe structural testing carried out at TASUMA's factory premesis. |
|
 |
Completed airframe, delivered to Cranfield Aerospace/University for preparation for commencement of flying trials. |
|